A pomodoro timer with a history and statistics, built the way an agent should build anything: one small rule at a time, the test before the code, and nothing called done until something other than the agent's word says so.
Fifteen short cycles and a gate. Every cycle is the same three steps, and the session asks for them in order: Red, a test of the new rule that fails; Green, the code that passes it; Refactor, the code improved while the tests stay as they were. Twelve rules come first, one small feature each: the clock face, the time left, the progress, a pause, the cycle of focus and breaks, your own lengths, the statistics, the week, a line for today, the export. Then two more levels of tests - the pieces together, then the real page in a real browser - and then a rule changes. The last task puts a gate in front of "done".
All the while the session tests your tests. At Red it runs them on its own correct rules: they must pass there and fail on yours. At Green it swaps your rules for copies with exactly one rule broken, the saboteurs: a test that fails caught one, a suite that stays green let it through. Coverage says which lines ran; a saboteur says whether anybody looked. A Test Integrity judge reads the history at the end: small steps and tests that survived the build earn points, and a test bent to get green takes them away.
4
Public
Product Build
red-green-pomodoro
30 min
~9 per session
No
10–150
- web
- testing
- tdd
- verification
- ai-adoption
1
The clock face
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
A pomodoro timer, built one rule at a time. Each task is one turn of
the same cycle: a failing test, the code that passes it, a tidy-up.
Never the code first.One cycle, three checks, asked in this order. Each comes back every
10 to 30 seconds until it passes, and only then the next one starts:Red the console of your new test failing, saved into red/.txt before the code exists; and that test passes on the session's own rules Green your code passes your tests; copies of the rules with this rule broken do not Refactor the code under src/ changed since green, the tests did not, and they still pass What each check answered is in
ololo session status: read it when a
step does not move on.The bench, once:
package.json with "type": "module".
src/rules.js, an ES module. The session swaps this file for its
own, so it exports exactly what the tasks name and nothing else.Unit tests under test/. They import from src/rules.js, need no
browser, no network and no real clock, and answer in seconds.AGENTS.md with one line:
unit:
The first rule:
| format(seconds) | the clock face, "MM:SS", two digits on each side: 1500 is "25:00", 65 is "01:05", 0 is "00:00" |
Write the test, run it, and keep what the console printed while it
failed: that file is what Red asks for, in every task. Then the code.
Inputs are always valid; test what the brief promises and nothing
more.Red wants the console of the failing run in red/face.txt.
Judged by
The Debrief 2
Time left
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
| remaining(startedAt, now, minutes) | the whole seconds left on the clock |
the numbers startedAt and now are milliseconds; minutes is the length of the interval rounding a second that has started still counts: with 24:59.5 left the answer is 1500 the end never below 0, however late now is src/rules.js now exports format and remaining.
Red wants the console of the failing run in red/left.txt.
3
How far along
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
| progress(startedAt, now, minutes) | how much of the interval is over, as a whole percent |
rounding down: 99 until the interval is really over, then 100 the ends 0 at the start; never above 100, however late now is src/rules.js now exports format, remaining and progress.
Red wants the console of the failing run in red/progress.txt.
4
A pause
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
A rule grows, same cycle: Red, Green, Refactor.
| remaining(startedAt, now, minutes, paused) | paused is the milliseconds the clock has stood still so far: they do not count as time spent |
an example a 25-minute focus started 10 minutes ago, 4 of them on pause, has 19 minutes left left out without the fourth argument nothing changes: the tests you have stay as they are Red wants the console of the failing run in red/pause.txt.
5
What comes next
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
| phaseAfter(history) | what comes next: "focus" or "short" |
an entry { type, date, minutes, completed }: type is "focus", "short" or "long", date is "YYYY-MM-DD"; a history lists entries oldest first the cycle an empty history starts with a focus; a completed focus is followed by a short break; a break is followed by a focus; a focus that was abandoned (completed: false) is followed by a focus again The long break comes in the next task: do not build it yet.
Red wants the console of the failing run in red/next.txt.
6
The long break
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
DURATIONS { focus: 25, short: 5, long: 15 }, in minutes the long break phaseAfter gives "long" after every fourth completed focus (the 4th, the 8th, ...), counted over the whole history; abandoned ones do not count; a long break, like a short one, is followed by a focus src/rules.js now also exports DURATIONS.
Red wants the console of the failing run in red/long.txt.
7
Your own lengths
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
| nextInterval(history, custom) | { type, minutes } of the interval to start |
type what phaseAfter(history) says minutes the length custom names for that type, when it is a number above 0: { focus: 50 } makes a focus 50 minutes and leaves the breaks alone default DURATIONS, when custom is left out or names nothing above 0 for that type Red wants the console of the failing run in red/lengths.txt.
8
Today and all time
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
| stats(history, today) | { today: { focus, minutes }, total: { focus, minutes }, rate } |
a focus counts only when completed; an abandoned one adds no focus and no minutes today, total the completed focuses and the sum of their minutes: on the date today, and over the whole history rate completed focuses out of all focuses, as a whole percent rounded to the nearest; 0 when there is no focus More fields come in the next task: a test that pins the whole object
will have to change with it.Red wants the console of the failing run in red/totals.txt.
9
Streak and best day
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
| stats(history, today) | now { today, total, streak, rate, best } |
streak the days in a row with at least one completed focus, ending today - or yesterday, while today has none yet best { date, focus } of the day with the most completed focuses, the earliest on a tie; null when there is none Months end: a streak runs across the first of a month.
Red wants the console of the failing run in red/streak.txt.
10
The week
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
| week(history, today) | seven days as a list of { date, focus, minutes }, oldest first, the last one today |
a day its completed focuses and the sum of their minutes no focus the day is still in the list, with 0 and 0 the edges a week runs across the first of a month Red wants the console of the failing run in red/week.txt.
11
One line for today
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
| summary(history, today) | today in words |
some focus "3 focuses, 75 minutes today" - the completed focuses of today and their minutes just one "1 focus", and "1 minute" when it comes to that none "No focus yet today" Red wants the console of the failing run in red/summary.txt.
12
The export
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The next rule, same cycle: Red, Green, Refactor.
| toCsv(history) | the history as CSV text |
the first line date,type,minutes,result an entry 2026-11-19,focus,25,completed - or abandoned the order newest first the lines joined by a line feed, none after the last src/rules.js now exports DURATIONS, format, remaining, progress,
phaseAfter, nextInterval, stats, week, summary and toCsv.Red wants the console of the failing run in red/export.txt.
13
The timer keeps a history
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
A new level, same cycle. The rules are pure; now come two pieces that
hold state, and the tests that run them together.a store is handed a storage (getItem, setItem) and keeps the history through it a timer is handed a clock and a store: it starts what nextInterval says, can be paused and resumed, records the interval as completed when the clock passes its end, and as abandoned when stopped early Integration tests under test/integration run the timer and the store
together, on a clock the test turns and a storage the test can read
back: no browser, and nobody waits 25 minutes.AGENTS.md gains one line:
integration:
Red red/history.txt holds the console of the integration test failing: the test is there, the timer is not Green the integration command passes, and so does the unit command Refactor the code changed since green, the tests did not, both commands pass 14
The page
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
The last level, same cycle: the real page in a real browser.
Scenario: The timer
When the page is open
Then it shows what comes next, the clock face and how far along
it is, with controls to start, pause and stop
And when the clock reaches 00:00 the interval goes into the
history as completed and the next one is offeredScenario: History and statistics
When intervals have been recorded
Then the history lists them newest first: date, kind, minutes,
completed or abandoned
And the statistics show the line for today, the total, the
streak, the rate, the best day and the seven days of the week
And one control exports the history as CSV
And all of it is still there after a reloadScenario: On a narrow screen
When the page opens on a phone
Then the clock, the history and the statistics fit without
scrolling sidewaysThe page uses src/rules.js, your timer and your store: no second copy
of a rule. One end-to-end test under e2e/ drives it: start a focus,
let the test's clock run it out, find it in the history and in the
statistics, reload. It does not sleep.AGENTS.md gains two lines:
run:
e2e:The session runs the e2e command in a copy of your folder with a free
port in the PORT variable: serve the page there when it is set.Red red/page.txt holds the console of the end-to-end test failing: the test is there, the page is not Green the e2e, the integration and the unit command pass Refactor the code changed since green, the tests did not, all three pass 15
The rule changes
+10 pts per passing check · +10 for completing the task
10
pts / check
+10 pts per passing check · +10 for completing the task
Rules change. Change them the way you built them: the test first.
the long break after every third completed focus (was: fourth), and it lasts 20 minutes (was: 15) a daily goal new: goal(history, today, target) gives { done, left, reached }: done is the completed focuses of today, left is how many are still missing and never below 0, reached is true from the focus that makes done equal to target src/rules.js now also exports goal. The old rule is a saboteur now:
rules that still give a long break after the fourth focus, or one of
15 minutes, must fail a test of yours. Rewriting those tests is the
rule changing, not a test bending.Red wants the console of the failing run in red/change.txt.
16
The gate
Open-ended — a panel of 8 judges splits a 150-pt budget
+3 150
pt budget
Open-ended — a panel of 8 judges splits a 150-pt budget
Fifteen cycles, each one seen red before it was green. The last thing to
build is the gate in front of "done", so that neither you nor your
agent can say it while a test is failing - and an honest account of
what all these tests verify.Scenarios:
Scenario: The gate
When theverify:command runs every level, the cheapest first,
and stops at the first that fails
Then it exits 0 only when all of them are green
And .claude/hooks/verify.sh, registered as a Stop hook in
.claude/settings.json, runs it and exits 2 while it fails, with
the reason on standard errorScenario: The gate is tried
When the session breaks five rules in a copy of your folder and
calls the verify: command, then the hook the way Claude Code does
Then both say no
And the hook finds the copy in CLAUDE_PROJECT_DIR, not at a path
it remembersScenario: The last saboteurs
When the session draws eight saboteurs from all the rules at once
Then a unit test fails on every oneAGENTS.md gains one line:
verify: <every level, cheapest first>
Write TESTING.md, for the next person who opens this project:
Each level - unit, integration, e2e: how many tests, how long it
takes, one bug it would catch that the level below would not,
and one thing it cannot see.The cycles: one where Red surprised you - a test that passed
when it should have failed, or failed for another reason - and
one refactoring the tests made safe.The saboteurs: one that survived at first, or the one that the
fewest tests catch, and the test that catches it.The gate: what verify: runs, in what order, and what happens when
your agent tries to stop while it fails.Three things that nothing here verifies.
Your tally, as two lines:
tests:
seen red first:
A panel reads the result: the tests, the code the refactoring steps
left behind, the page and TESTING.md. One judge will ask for two
screenshots of the page with a few intervals in the history,
desktop.png and mobile.png (about 375 px wide): have them ready, your
e2e test is the natural place to take them. A Test Integrity judge reads the history
of the repository: small steps, tests that survived the build and a
gate that holds earn up to 50 points. Points are taken away for rules
that recognise the tests' inputs, a test bent or switched off to get
green, a fake in place of the thing under test, a gate switched off,
and a claim the evidence contradicts.When you are done, write .ololo/red-green-pomodoro-done.md with a